In production environment today, "silo thinking" is a challenge where controlling an asset associated with several disciplines and departments can lead to a suboptimal result. This requires a more integrated approach with an integrated planning (IPL) framework. In this framework novel maintenance key performance indicators (KPIs) are needed. The purpose of this article is to develop the novel maintenance KPI profit loss indicator (PLI). This indicator is based on measuring both on the "hidden factory" and waste in production, presenting it as a financial measure. The notion "hidden factory" is used as a metaphor for measuring the time losses in industry through the maintenance KPI overall equipment effectiveness (OEE). This indicator divides the time losses into availability losses, performance losses and quality losses. In addition, a financial measure for waste based on literature from Toyota production system (TPS) and waste treatment and disposal is also included in PLI. Through a case study in the saw mill industry PLI is demonstrated and evaluated. It is expected that this indicator will be demonstrated in several industry branches in the future.
Harald Rø
,
dseth
,
Terje Skarlo
,
Per Schjø
,
lberg
. Profit loss indicator: a novel maintenance indicator applied for integrated planning[J]. Advances in Manufacturing, 2015
, 3(2)
: 139
-150
.
DOI: 10.1007/s40436-015-0113-6
1. Rødseth H, Schjølberg P (2014) The importance of asset management and hidden factory for integrated planning. Adv Mater Res 1039:577-584
2. Powell D, Rødseth H (2013) ICT-enabled integrated operations: towards a framework for the integration of manufacturing- and maintenance planning and control. Paper presented at the advances in production management systems: sustainable production and service supply chains, Penn State University,2013-09-09-2013-09-12
3. Center I (2013) Annual Report 2013-Center for integrated operations in the petroleum industry
4. Aghezzaf EH, Najid NM (2008) Integrated production planning and preventive maintenance in deteriorating production systems. Inf Sci 178(17):3382-3392
5. Kovács A (2005) Novel models and algorithms for integrated production planning and scheduling. Budapest University of Technology and Economics, Budapest
6. Portioli-Staudacher A, Tantardini M (2012) Integrated maintenance and production planning: a model to include rescheduling costs. J Qual Maint Eng 18(1):42-59
7. Iravani SMR, Duenyas I (2002) Integrated maintenance and production control of a deteriorating production system. IIE Trans (Inst Ind Eng) 34(5):423-435
8. Kazaz B, Sloan TW (2013) The impact of process deterioration on production and maintenance policies. Eur J Oper Res. doi:10.1016/j.ejor.2012.11.052
9. Najid NM, Alaoui-Selsouli M, Mohafid A (2011) An integrated production and maintenance planning model with time windows and shortage cost. Int J Prod Res 49(8):2265-2283
10. Rødseth H, Schjølberg P (2014) Integrated planning: a novel concept for maintenance management. Paper presented at the EuroMaintenance 2014, Finland
11. Kerzner H (2011) Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring project performance. International Institute for Learning, Hoboken
12. Koch A, Oskam A (2007) OEE for the production team: the complete OEE user guide. FullFact, Lieshout
13. Williams PT (2005) Waste treatment and disposal. Wiley, Chichester
14. Liker JK, Meier D (2006) The Toyota way fieldbook: a practical guide for implementing Toyota's 4Ps. McGraw-Hill, New York
15. Al-Najjar B (2006) A model to diagnose the deviation in the maintenance performance measures. In: Proceedings of the 1st world congress on engineering asset management,WCEAM2006, pp 87-93
16. Rødseth H, Langeland C, Myklebust O (2012) Integrated key performance indicators-a tool for smarter decision making. In: Proceedings of IWAMA 2012-the second international workshop of advanced manufacturing and automation. NTNU Engineering Series, Tapir Akademisk Forlag, pp 259-266
17. IEC (1990) IEC 60050-191: international electrotechnical vocabulary. Chapter 191: dependability and quality of service. International Electrotechnical Commission, Geneva
18. Rausand M, Høyland A (2004) System reliability theory: models, statistical methods, and applications. Wiley-Interscience, Hoboken
19. Rødseth H, Andersen B (2013) Early warning indicators for integrated planning. Paper presented at the PMAA 2013 Conference, New Zealand
20. Al-Najjar B (1996) Total quality maintenance: an approach for continuous reduction in costs of quality products. J Qual Maint Eng 2(3):4-20
21. Juran JM (1951) Quality control handbook, 1st edn. McGraw- Hill, New York
22. Nakajima S (1989) TPM development program: implementing total productive maintenance. Productivity Press, Cambridge, Mass
23. BLOM (2003) OEE Industry Standard: version 2.0 August 2003. Blom Consultancy, The Nederlands
24. Shirose K (1996) TPM total productive maintenance new implementation program. Japan Institute of Plant maintenance, Tokyo
25. NS-EN 13306 (2010) Maintenance: maintenance terminology. European Committee for Standardization (CEN), Brussels
26. ISO (2005) ISO 9000 qualitative management systems—fundamentals and vocabulary. ISO, London
27. Linderman K, Schroeder RG, Zaheer S, Choo AS (2003) Six Sigma: a goal-theoretic perspective. J Oper Manag 21(2):193-203
28. Rolstadås A, Andersen B, Schjølberg P (1999) Produksjons—og driftsteknikk. Tapir, Trondheim
29. IEC 60300-3-3 (2004) Dependability management - application guide: life cycle costing. International Electrotechnical Commission, Geneva
30. Blanchard BS, Fabrycky WJ (2011) Systems engineering and analysis. Pearson, Boston
31. Wilson A (2002) Asset maintenance management: a guide to developing strategy & improving performance. Industrial Press, New York
32. Leiwy D, Perks R (2013) Accounting: understanding and practice. McGraw-Hill, Maidenhead
33. Myklebust O (2002) Enterprise modelling supported by manufacturing systems theory. Dissertation, Norwegian University of Science and Technology, Trondheim
34. Lange J, Iwanitz F, Burke TJ (2010) OPC: from data access to unified architecture. VDE Verlag, Berlin